Before you sign with a contractor: the printable checklist
Tick every item before you sign a renovation contract. The list follows the advice of the Régie du bâtiment du Québec (RBQ) and the Office de la protection du consommateur (OPC).
Portail de soumissions · portaildesoumissions.ca/before-you-sign
Checklist prepared for this company
Siemens Canada limitée · Montréal
RBQ licence 8230-6721-56 · NEQ 1161355988
✓ Licence active in RBQ data dated November 6, 2026
Licence subcategories (your work must fall under them) : 1.2 Small buildings · 1.3 Buildings of all kinds · 1.7 Telecommunications and electric power transmission and distribution · 10 Solid-fuel space heating (wood stoves, fireplaces) · 11.2 Special equipment and products · 13.2 Fire alarm systems · 13.3 Fire extinguishing systems · 13.4 Local fire extinguishing systems · 15.1 Forced-air heating systems · 15.2 Natural gas burner systems · 15.3 Oil burner systems · 15.4 Hydronic heating systems · 15.5 Plumbing · 15.6 Propane · 15.7 Residential ventilation · 16 Electrical work · 17.1 Instrumentation and control · 17.2 Intercom, telephone and surveillance systems
Licence checked in the RBQ official register on
1. The company
2. The quotes
3. The contract
4. Payments
5. During and after the work
My notes
Quote 1: company, price
Quote 2: company, price
Quote 3: company, price
Signing date, deposit paid
Sources : RBQ: Signing a renovation contract · OPC: Before hiring a renovation contractor · OPC: Get information about a merchant. This checklist sums up public advice; it is not legal advice.