Quote
Portal

Before you sign with a contractor: the printable checklist

Tick every item before you sign a renovation contract. The list follows the advice of the Régie du bâtiment du Québec (RBQ) and the Office de la protection du consommateur (OPC).

Back to the company profile

Portail de soumissions · portaildesoumissions.ca/before-you-sign

Checklist prepared for this company

9078-4042 Québec inc. · Montréal

RBQ licence 8238-6558-23 · NEQ 1148623102

✓ Licence active in RBQ data dated November 6, 2026

Licence subcategories (your work must fall under them) : 1.1.1 New residential buildings covered by a guarantee plan, class I · 1.1.2 New residential buildings covered by a guarantee plan, class II · 1.2 Small buildings · 1.3 Buildings of all kinds · 1.4 Roads and pipelines · 1.5 Civil engineering structures · 1.6 Underwater civil engineering works · 1.7 Telecommunications and electric power transmission and distribution · 1.8 Petroleum equipment installation · 2.1 Drilled wells · 2.2 Non-drilled water catchment works · 2.3 Groundwater pumping systems · 2.4 On-site wastewater (septic) systems · 2.5 Excavation and earthwork · 2.6 Piles and special foundations · 2.7 Site work · 2.8 Blasting · 3.1 Concrete structures · 3.2 Small concrete works · 4.1 Masonry structures · 4.2 Non-structural masonry, marble and ceramic work · 5.1 Steel structures and precast concrete · 5.2 Metal works · 6.1 Wood framing · 6.2 Wood and plastic work · 7 Insulation, waterproofing, roofing and exterior cladding · 8 Doors and windows · 9 Finishing work · 10 Solid-fuel space heating (wood stoves, fireplaces) · 11.1 Industrial or institutional pressure piping · 11.2 Special equipment and products · 12 Manufactured cabinets and countertops · 13.1 Lightning protection · 13.3 Fire extinguishing systems · 13.4 Local fire extinguishing systems · 13.5 Special or prefabricated installations · 15.7 Residential ventilation · 17.1 Instrumentation and control

Licence checked in the RBQ official register on

1. The company

2. The quotes

3. The contract

4. Payments

5. During and after the work

My notes

Quote 1: company, price

Quote 2: company, price

Quote 3: company, price

Signing date, deposit paid

Sources : RBQ: Signing a renovation contract · OPC: Before hiring a renovation contractor · OPC: Get information about a merchant. This checklist sums up public advice; it is not legal advice.

Get free quotes →