Quote
Portal

Before you sign with a contractor: the printable checklist

Tick every item before you sign a renovation contract. The list follows the advice of the Régie du bâtiment du Québec (RBQ) and the Office de la protection du consommateur (OPC).

Back to the company profile

Portail de soumissions · portaildesoumissions.ca/before-you-sign

Checklist prepared for this company

Les Services de Peinture Bordeaux Inc. · Beaconsfield

RBQ licence 8281-4567-31 · NEQ 1160786183

✓ Licence active in RBQ data dated November 6, 2026

Licence subcategories (your work must fall under them) : 2.6 Piles and special foundations · 2.7 Site work · 2.8 Blasting · 3.2 Small concrete works · 4.2 Non-structural masonry, marble and ceramic work · 5.1 Steel structures and precast concrete · 5.2 Metal works · 6.2 Wood and plastic work · 7 Insulation, waterproofing, roofing and exterior cladding · 8 Doors and windows · 9 Finishing work · 11.1 Industrial or institutional pressure piping · 11.2 Special equipment and products · 13.1 Lightning protection · 13.4 Local fire extinguishing systems

Licence checked in the RBQ official register on

1. The company

2. The quotes

3. The contract

4. Payments

5. During and after the work

My notes

Quote 1: company, price

Quote 2: company, price

Quote 3: company, price

Signing date, deposit paid

Sources : RBQ: Signing a renovation contract · OPC: Before hiring a renovation contractor · OPC: Get information about a merchant. This checklist sums up public advice; it is not legal advice.

Get free quotes →