Quote
Portal

Septic systems in Duhamel-Ouest

RBQ data dated November 3, 2026: one company active in Duhamel-Ouest for septic system work.

Excavation on a wooded lot
Get quotes for septic system work in Duhamel-OuestFree, no obligation: describe your work once, licensed companies answer you.
Get my free quotes →

Active licences in RBQ data dated November 3, 2026 · official register ↗ · list order

Ad · Featured placement · examplePreview only — this is not a contractor listing

Your business could appear hereSeptic systems · Duhamel-Ouest and the cities you serveHomeowners can open your profile and call you directly.

Other cities

Val-d'Or 27Rouyn-Noranda 19Amos 11La Sarre 3Saint-Marc-de-Figuery 3

Other trades in Duhamel-Ouest

Finding a septic system contractor in Duhamel-Ouest

In Duhamel-Ouest, one company holds an active RBQ licence for septic system work, according to RBQ data dated November 3, 2026.

In the Abitibi-Témiscamingue region, 100 companies work in this trade across 34 cities; Duhamel-Ouest has 1 of them (16th).

The choice is limited in Duhamel-Ouest. Companies from nearby cities in the region, such as Val-d'Or (27), Rouyn-Noranda (19) and Amos (11), may also serve your area: ask them.

The RBQ numbers: septic systems in Duhamel-Ouest

1companies with an active licence
0new licences in 90 daysnone in the last 30 days
1have held their licence for 10 years or more100% · the oldest since 2005
0have a $40,000 licence bondand 1 at $20,000 · may compensate a client under RBQ rules
  • All of them have a published phone number: you can call them directly.
  • Most common subcategories: 2.1 Drilled wells (1), 2.2 Non-drilled water catchment works (1), 2.3 Groundwater pumping systems (1), 2.4 On-site wastewater (septic) systems (1).

Open data of the Régie du bâtiment du Québec as of November 3, 2026, updated every night.

Required licence, issuing body and subcategories for this trade: Septic systems in Greater Montréal.

Before you sign with a septic system contractor in Duhamel-Ouest: check the licence on the day, ask for written quotes and avoid large deposits. Printable checklist before you sign →

See also

Get free quotes →