Construction Larix inc.
Renovation, construction and general workNew home buildersHeating, ventilation and air conditioningWood stoves and fireplacesConcrete and foundations
Call · 819 322-2538RBQ data dated November 3, 2026: 5 companies active in Val-David for building a new home. 3 (60%) have held their licence for 10 years or more, the oldest since 2011; none got its licence in the last 90 days.

Renovation, construction and general workNew home buildersHeating, ventilation and air conditioningWood stoves and fireplacesConcrete and foundations
Call · 819 322-2538Renovation, construction and general workNew home builders
Call · 819 217-7217Renovation, construction and general workNew home builders
Call · 819 217-7609Renovation, construction and general workNew home builders
Call · 819 324-8312Renovation, construction and general workNew home builders
Call · 514 571-7129Ad · Featured placement · examplePreview only — this is not a contractor listing
Mirabel 43Blainville 29Saint-Jérôme 28Mont-Tremblant 22Boisbriand 18Saint-Sauveur 18Saint-Colomban 17Sainte-Adèle 16Prévost 12Mont-Laurier 12Saint-Eustache 10Saint-Hippolyte 10
Looking for a new home builder in Val-David? All 5 companies on the list are also listed in other trades: renovation, construction and general work (5), heating, ventilation and air conditioning (1) and wood stoves and fireplaces (1).
In the Laurentides region, 364 companies work in this trade across 53 cities; Val-David has 5 of them (24th).
The choice is limited in Val-David. Companies from nearby cities in the region, such as Mirabel (43), Blainville (29) and Saint-Jérôme (28), may also serve your area: ask them.
Open data of the Régie du bâtiment du Québec as of November 3, 2026, updated every night.
Required licence, issuing body and subcategories for this trade: New home builders in Greater Montréal.
Source: Statistics Canada, 2021 Census, table 98-10-0233-01 (25% sample, rounded counts), Statistics Canada Open Licence.
Before you sign with a new home builder in Val-David: check the licence on the day, ask for written quotes and avoid large deposits. Printable checklist before you sign →