Quote
Portal

See also all the companies of West Island in Montréal.

All companies

Active licences in RBQ data dated November 3, 2026 · official register ↗ · list order

Couvertures West-Island inc.

✓ RBQ licence 2366-3511-46 · Pointe-Claire · Licensed since 1986

Renovation, construction and general workHeating, ventilation and air conditioningRoofersWood stoves and fireplacesMasonryConcrete and foundationsSeptic systemsWells and water pumps

Call · 514 695-3535

Construction Jenevo inc.

✓ RBQ licence 5835-4424-01 · Pointe-Claire · Licensed since 2026

Renovation, construction and general workHeating, ventilation and air conditioningWood stoves and fireplaces

Call · 514 664-1619

Crisman rénovation inc.

✓ RBQ licence 5607-3851-01 · Pointe-Claire · Licensed since 2010

Renovation, construction and general workPlumbersHeating, ventilation and air conditioningWood stoves and fireplaces

Call · 514 570-7323

9313-8386 Québec inc.

✓ RBQ licence 5701-2569-01 · Pointe-Claire · Licensed since 2015

Renovation, construction and general workHeating, ventilation and air conditioningWood stoves and fireplaces

Call · 514 898-1109

Industries Toromont ltée

✓ RBQ licence 8314-6365-16 · Pointe-Claire · Licensed since 2006

Renovation, construction and general workPlumbersHeating, ventilation and air conditioningWood stoves and fireplaces

Call · 514 331-5360

Pointe-Claire by the numbers

Pointe-Claire: years licensed, contractors

Largest group in Pointe-Claire: under 5 years, 45 of 106; 20 years or more (9), 10 to 19 years (30), 5 to 9 years (22), under 5 years (45). Median in Pointe-Claire: 2019. Longest licensed in Pointe-Claire: Les entreprises d'électricité G.G. Ltée (1984), BBR Québec (1980) Inc. (1984) and Couvertures West-Island inc. (1986). Newest: Construction HomeScapes inc. (September 22, 2026) and Services Résidentiels Nivara, inc. (August 27, 2026). Pointe-Claire, licences per year: 2022 (4), 2023 (8), 2024 (7), 2025 (13), 2026 (11).

Pointe-Claire: licences, contractors

Pointe-Claire, trades: renovation (47), specialty (36), electrical (15), heating (11), stoves (10), plumbing (5), new homes (4), roofing (3), masonry (2), foundations (2), septic (2), wells (2). Subcategories in Pointe-Claire: any building (35), small buildings (34), electrical (15), wood heating (10), home ventilation (10), framing (5). Bonds in Pointe-Claire: 61 at $40,000, 45 at $20,000. 39 have another name.

Pointe-Claire: homes, 2021 Census

Pointe-Claire: 13,315 dwellings, 69% owners, 50% single-detached houses. Periods in Pointe-Claire: before 1961 36%, 1961-1980 26%, 1981-2000 21%, after 2000 17%. 126 dwellings per company in Pointe-Claire (Montréal 162).

Comparisons, Pointe-Claire

First licences in Pointe-Claire, by decade: 1980s (3), 1990s (2), 2000s (9), 2010s (44), 2020s (48). 20 years or more: 8% of licences in Pointe-Claire, 15% in Montréal. Pointe-Claire: 8 contractors per 1,000 dwellings; town average 17.6, highest Mirabel (32.4), lowest Pointe-Claire (8). Region of Pointe-Claire: Montréal, 6,171 licensed companies in all.

Neighbours of Pointe-Claire

Pointe-Claire, 106 licensed companies: 26th of 26 towns; around it: La Prairie (137). Close to Pointe-Claire: Dollard-des-Ormeaux (152), Châteauguay (246) and Laval (2,671).

Open tenders in Pointe-Claire

3 public construction tenders are open in Pointe-Claire, according to SEAO and CanadaBuys as of November 3:

The tenders board · only the official notice counts.

Renovation permits in Pointe-Claire

According to the City of Pointe-Claire, a building permit is required before any construction, alteration or extension of a building or a deck, excavation, installing a fireplace or a heating system, replacing a heating system with another type, and changing the exterior appearance of a building subject to the PIIA by-law. Regular maintenance and minor repairs do not need one, but must comply with the by-laws. Replacing or repairing private service lines needs a certificate of authorization, except French drains, which need a building permit. For a renovation, the plans show the existing building and the planned changes. You apply through the online platform or by email; anyone filing for the owner must have the owner’s written authorization. No work can begin before the permit is issued, and it must be posted on the site, visible from the street.

Other trades in Pointe-Claire

Wood stoves and fireplaces — 10 licence holders in Pointe-Claire, the first licence in 1986.

Get free quotes →