Couvertures West-Island inc.
Renovation, construction and general workHeating, ventilation and air conditioningRoofersWood stoves and fireplacesMasonryConcrete and foundationsSeptic systemsWells and water pumps
Call · 514 695-353511 HVAC companies in Pointe-Claire; licences from 1986 to February 17, 2026, median 2013.

See also all the companies of West Island in Montréal.
Renovation, construction and general workHeating, ventilation and air conditioningRoofersWood stoves and fireplacesMasonryConcrete and foundationsSeptic systemsWells and water pumps
Call · 514 695-3535Renovation, construction and general workHeating, ventilation and air conditioningWood stoves and fireplaces
Call · 514 664-1619Renovation, construction and general workPlumbersHeating, ventilation and air conditioningWood stoves and fireplaces
Call · 514 570-7323Renovation, construction and general workHeating, ventilation and air conditioningWood stoves and fireplaces
Call · 514 898-1109Renovation, construction and general workPlumbersHeating, ventilation and air conditioningWood stoves and fireplaces
Call · 514 331-5360Heating, ventilation and air conditioningWood stoves and fireplacesMasonry
Call · 514 426-6225Heating, ventilation and air conditioning
Call · 438 878-4153Renovation, construction and general workHeating, ventilation and air conditioningWood stoves and fireplaces
Call · 514 592-4101Renovation, construction and general workHeating, ventilation and air conditioningWood stoves and fireplaces
Call · 514 966-0966Renovation, construction and general workHeating, ventilation and air conditioningWood stoves and fireplacesConcrete and foundations
Call · 514 744-5644Renovation, construction and general workNew home buildersHeating, ventilation and air conditioningWood stoves and fireplaces
Call · 514 697-7777Ad · Featured placement · examplePreview only — this is not a contractor listing
Largest group in Pointe-Claire: 10 to 19 years, 6 of 11; 20 years or more (2), 10 to 19 years (6), 5 to 9 years (1), under 5 years (2). Median in Pointe-Claire: 2013. Longest licensed in Pointe-Claire: Couvertures West-Island inc. (1986), Morel Services Inc. (2003) and Industries Toromont ltée (2006). Newest: Construction Jenevo inc. (February 17, 2026) and Climatisation L&D inc. (March 9, 2022).
Pointe-Claire: 1 HVAC companies with no other trade, 10 also work in stoves (10), renovation (9), masonry (2), foundations (2). Subcategories in Pointe-Claire: wood heating (10), home ventilation (10), small buildings (9), any building (8), masonry (2), framing (2). Bonds in Pointe-Claire: 10 at $40,000, 1 at $20,000; 2 CMMTQ licences. 5 have another name.
Pointe-Claire: 13,315 dwellings, 62% older than 1981, 17% newer than 2000. Periods in Pointe-Claire: before 1961 36%, 1961-1980 26%, 1981-2000 21%, after 2000 17%. 1,210 dwellings per HVAC company in Pointe-Claire (Montréal 903).
First licences in Pointe-Claire, by decade: 1980s (1), 2000s (3), 2010s (5), 2020s (2). 20 years or more: 18% of licences in Pointe-Claire, 36% in Montréal. Pointe-Claire: 0.8 HVAC contractors per 1,000 dwellings; town average 3, highest Mirabel (5.6), lowest Pointe-Claire (0.8). Region of Pointe-Claire: Montréal, 1,103 HVAC companies in all.
Pointe-Claire, 11 HVAC companies: 26th of 26 towns; around it: Dollard-des-Ormeaux (21). Close to Pointe-Claire: Dollard-des-Ormeaux (21), Châteauguay (33) and Laval (485).
3 public construction tenders are open in Pointe-Claire, according to SEAO and CanadaBuys as of November 3:
The tenders board · only the official notice counts.
According to the City of Pointe-Claire, a building permit is required before any construction, alteration or extension of a building or a deck, excavation, installing a fireplace or a heating system, replacing a heating system with another type, and changing the exterior appearance of a building subject to the PIIA by-law. Regular maintenance and minor repairs do not need one, but must comply with the by-laws. Replacing or repairing private service lines needs a certificate of authorization, except French drains, which need a building permit. For a renovation, the plans show the existing building and the planned changes. You apply through the online platform or by email; anyone filing for the owner must have the owner’s written authorization. No work can begin before the permit is issued, and it must be posted on the site, visible from the street.
Official pages: Applying for a permit (in French) ↗ · How to get a building permit, 1 to 4 units (in French) ↗ · Printable checklist before you sign