Atelier Sourèche Rangaya inc.
Heating, ventilation and air conditioningWood stoves and fireplacesMasonryConcrete and foundationsSeptic systemsWells and water pumps
Call · 819 570-6955RBQ data dated November 3, 2026: 3 companies active in Waterville for concrete or foundation work. All of them have held their licence for 10 years or more, the oldest since 2013; none got its licence in the last 90 days.

Heating, ventilation and air conditioningWood stoves and fireplacesMasonryConcrete and foundationsSeptic systemsWells and water pumps
Call · 819 570-6955Concrete and foundations
Call · 819 578-3543Concrete and foundations
Call · 819 821-1575Ad · Featured placement · examplePreview only — this is not a contractor listing
Sherbrooke 36Granby 14Magog 9Shefford 7Cowansville 4Coaticook 4Saint-Denis-de-Brompton 4Farnham 3Bromont 3Lac-Mégantic 3Potton 3Hatley 3
Looking for a concrete and foundation contractor in Waterville? 2 of the 3 companies on the list work in this trade only; the others are also listed in other trades: heating, ventilation and air conditioning (1), wood stoves and fireplaces (1) and masonry (1).
In the Estrie region, 142 companies work in this trade across 48 cities; Waterville has 3 of them (11th).
The choice is limited in Waterville. Companies from nearby cities in the region, such as Sherbrooke (36), Granby (14) and Magog (9), may also serve your area: ask them.
Useful guides: Pyrite under the slab: signs, SPPI index and BNQ standard · Digging and retaining walls: locate request and permits · Radon test at home: when to test and how to fix it
Open data of the Régie du bâtiment du Québec as of November 3, 2026, updated every night.
Required licence, issuing body and subcategories for this trade: Concrete and foundations in Greater Montréal.
Source: Statistics Canada, 2021 Census, table 98-10-0233-01 (25% sample, rounded counts), Statistics Canada Open Licence.
Before you sign with a concrete and foundation contractor in Waterville: check the licence on the day, ask for written quotes and avoid large deposits. Printable checklist before you sign →