Sécuritech inc.
Electricians
Call · 514 731-5000Côte-des-Neiges has 11 electrical companies; years licensed in Côte-des-Neiges: 20 or more 1, 10 to 19 1, under 10 9.

Choose your area
Ahuntsic-Cartierville 35Anjou 13Côte-des-Neiges 11Côte-Saint-Luc, Hampstead and Montréal-West 18Lachine 19LaSalle 40Le Plateau-Mont-Royal 15Le Sud-Ouest 20Mercier–Hochelaga-Maisonneuve 25Montréal-Nord 26Mount Royal (TMR) 10NDG (Notre-Dame-de-Grâce) 22Outremont 5Rivière-des-Prairies–Pointe-aux-Trembles 58Rosemont–La Petite-Patrie 19Saint-Laurent 66Saint-Léonard 45Verdun 14Ville-Marie (Downtown) 22Villeray–Saint-Michel–Parc-Extension 31West Island 113Westmount 1All of Montréal
Electricians
Call · 514 731-5000Renovation, construction and general workElectricians
Call · 514 644-2333Côte-des-Neiges, 11 electrical companies — under 5 years (7), 5 to 9 years (2), 10 to 19 years (1), 20 years or more (1). Median in Côte-des-Neiges: 2025. Longest licensed in Côte-des-Neiges: Télécon inc. (1985), Sécuritech inc. (2014) and Entreprise Électriquecom Inc. (2016). Newest: 9561-7825 Québec inc. (September 28, 2026) and DMR Électrique inc. (March 12, 2026).
Other trades in Côte-des-Neiges: renovation (2), plumbing (1), heating (1); single trade: 9 of 11. Subcategories in Côte-des-Neiges: instrumentation (2), any building (2), fire alarms (1), sprinklers (1), small buildings (1), forced air (1). Bonds in Côte-des-Neiges: 2 at $40,000, 9 at $20,000; 10 CMEQ licences. 3 have another name.
First licences in Côte-des-Neiges, by decade: 1980s (1), 2010s (3), 2020s (7). 20 years or more: 9% of licences in Côte-des-Neiges, 18th of 22 areas (island: 25%).
Côte-des-Neiges covers Côte-des-Neiges. Côte-des-Neiges rank: 19th of 22 areas, between Anjou (13) and Mount Royal (TMR) (10). Côte-des-Neiges share: 2% of 628 electricians.
Electrical work in Côte-des-Neiges: 1 of 532 permits, 0%. Electrical work: 0% in Côte-des-Neiges, 1% across Montréal. In all, Côte-des-Neiges: 532 permits, 399 of them alterations. 2 borough permits that could not be placed in a district are counted on neither page.
Source: Ville de Montréal, “Permis de construction, transformation et démolition”, open data, CC BY 4.0 · permits issued October 27, 2025 to October 26, 2026 · dataset updated October 29, 2026 · trades counted from the work descriptions · borough split by electoral district (Côte-des-Neiges, Darlington, Snowdon / Notre-Dame-de-Grâce, Loyola).
Côte-des-Neiges is part of the Côte-des-Neiges–Notre-Dame-de-Grâce borough: its permit counter is reached at the Bureau Accès Montréal or by email, and some applications can be made online. Work in the Sainte-Justine university hospital sector is among the projects that require PIIA (site planning and architectural integration) review, as is altering a building in a heritage sector.
Official pages: Permit counter – Côte-des-Neiges–Notre-Dame-de-Grâce (in French) ↗ · PIIA approval – Côte-des-Neiges–Notre-Dame-de-Grâce borough (in French) ↗