9012-6491 Québec inc.
Renovation, construction and general workHeating, ventilation and air conditioningWood stoves and fireplacesConcrete and foundationsSeptic systemsWells and water pumps
Call · 450 471-7206RBQ data dated November 3, 2026: 2 companies active in Lachenaie for renovation or construction work. All of them have held their licence for 10 years or more, the oldest since 1998; none got its licence in the last 90 days. Closest: Terrebonne (442), Mascouche (182) and Repentigny (236).

Renovation, construction and general workHeating, ventilation and air conditioningWood stoves and fireplacesConcrete and foundationsSeptic systemsWells and water pumps
Call · 450 471-7206Renovation, construction and general workNew home buildersHeating, ventilation and air conditioningWood stoves and fireplaces
Call · 514 944-8206Ad · Featured placement · examplePreview only — this is not a contractor listing
Montréal 3,211Terrebonne 442Mascouche 182Repentigny 236Boucherville 129L'Assomption 102Sainte-Julie 99Laval 1,220Longueuil 442Sainte-Thérèse 63Boisbriand 132
For renovation or construction work in Lachenaie (region: Lanaudière), 2 companies hold an active RBQ licence as of November 3, 2026. Compare them above: licence number, years licensed and phone.
In the Lanaudière region, 1,945 companies work in this trade across 60 cities; Lachenaie has 2 of them (50th).
The choice is limited in Lachenaie. Companies from nearby cities in the region, such as Montréal (3,211), Terrebonne (442) and Mascouche (182), may also serve your area: ask them.
Useful guides: Multigenerational home in Québec: tax credit and permits · Digging and retaining walls: locate request and permits · Rebuilding a balcony: fibreglass deck, railings, permits
Open data of the Régie du bâtiment du Québec as of November 3, 2026, updated every night.
Required licence, issuing body and subcategories for this trade: Renovation, construction and general work in Greater Montréal.
Before you sign with a renovation contractor in Lachenaie: check the licence on the day, ask for written quotes and avoid large deposits. Printable checklist before you sign →